How To Prevent And Deal With Problems In The Construction Of Stainless Steel Threaded Pipe Fittings

Views: 0     Author: Site Editor     Publish Time: 2021-07-13      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

During the construction of stainless steel threaded pipe fittings, once a large amount of water enters the trench and reaches a certain water level, it will not only float up the pipe that has just been laid and not covered with soil, but also make the filled soil (soil on the top of the pipe) (Shallow) Stainless steel threaded pipe fittings may also float. This is because when the buoyancy of the water is greater than the weight of the tube (including the weight of the water in the tube and the weight of the soil above the top of the tube), the tube will float up due to loss of balance. In this way, the floating pipe may cause the position of the pipe to move, the deformation of the pipe body, the cracking of the pipe mouth, and the silt under the pipe. If so, stainless steel threaded pipe fittings must be reprocessed before they can be used. This has a lot of impact on project progress, project quality, cost and work mood. Therefore, during construction, all necessary measures should be taken to avoid such accidents.

How can we prevent the occurrence of floating tube accidents?

Arrange construction procedures reasonably

In the arrangement of the project, it is necessary to make reasonable construction deployment. For the whole line of stainless steel threaded pipe fittings, a reasonable construction process should be determined according to the specific situation. During the rainy season construction, make one section, close one section, and try to reduce the working area. Also shorten the construction period of each section, leaving no tails. Do not avoid blooming across the line, disperse forces, and arrange construction regardless of key points. This is the key to avoid floating tubes.


Request A Quote
The company provides professional technical support, high-quality services, and high-quality products.

Products

Leave a Message
Get In Touch With Us

Fast Links

Company Info

 +8618621531073 
 cooperpipe 
 +86-577-86801027 
 Building 2, No.3991, Binhai 3 Road, Wenzhou Economic Technological Development
Copyright © 2024 Wenzhou Lianhe Valve Fitting Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy 浙ICP备2024125178号-1